Works at km 17 to km 24 in the direction of Łódź have been completed. Works are still underway at km 50 to km57 in the direction of Gdańsk.

Works have been completed on a seven-kilometre section from km 17+300 to km 24+600 located between the Swarożyn and Stanisławie junctions.

Work is still underway at km 50+600 to 57+300 between the Pelplin – Kopytkowo junctions, where the roadway in the direction of Gdańsk is being renovated, and traffic is moving in two lanes in the direction of Łódź and one lane in the direction of Gdańsk. Renovation works on this section should be completed at the beginning of September, their completion depends on weather conditions.

Km 35+889 to 43+350 between the Pelplin – Kopytkowo junctions

Pelplin junction closed in the direction of Łódź.

The Olsze MOP closed in the direction of Łódź.

Traffic takes place in two lanes in the direction of Gdańsk and one lane in the direction of Łódź.

Km 57+300 to km 65+150 between the Kopytkowo – Warlubie junctions

Kopytkowo junction closed in the direction of Gdańsk.

Traffic takes place in two lanes in the direction of Łódź and one lane in the direction of Gdańsk.

 