Attention possible traffic problems

On the AmberOne A1 Motorway, works are underway to repair fragments of the motorway surface. The works have been divided into several stages and locations, below we present the planned locations of work. The order and time of occurrence of difficulties depends on weather conditions.

  • km 28+130 narrowing down to one lane on the roadway in the direction of Gdańsk on the length of about 2 km
  • km 88+500 narrowing down to one lane on the roadway in the direction of Gdańsk on the length of about 1.5 km

Planned completion of works on December 4,  2021.

We apologize for the inconvenience to traffic and ask you to drive carefully.

km 81+300 to km 90+000 between the Warlubie – Nowe Marzy junctions

Traffic  takes place in two lanes in the direction of Łódź and one lane in the direction of Gdańsk.

 Nowe Marzy interchange is closed in the direction of Gdańsk  

More info